Skip to main content
DEMO ENVIRONMENTSample data — no live external actions
Business Agent OSi-STEMer Demo
Approval package · PENDING

Social Campaign Q3 Budget Allocation

Tier: persisted_exact_revisionDue: 19/08/2026, 12:15 Africa/CairoAgent: Marketing

Requested action

Allocate the proposed budget for social campaign distribution channels in Q3.

Business reason

The campaign brief has been drafted and the social plan is ready for production. Before the social campaign can proceed, a budget allocation must be approved. This is a placeholder approval — no real spend is possible from this demo interface.

Artifact / revision

Artifact ref
run:mk-2026-08-18-0002 / draft_campaign_brief_v2 / social_budget_proposal_v2
Target system
Budget management system (fixture — no live system)
Changes from previous revision

This is the second draft (v2). Previous draft (v1) allocated EGP 8,000 across two channels. This revision adds a third channel (video shorts) and increases the total by EGP 4,000 based on competitor intelligence gathered in run:mk-2026-08-18-0001.

Supporting evidence

  • run:mk-2026-08-18-0001 — campaign brief draft assembled from approved objective
  • run:sm-2026-08-18-0011 — draft social plan with channel breakdown and reach estimates
  • competitor_summary — competitor intelligence used to size channel allocation

Expected result and risks

Expected result
Budget allocation confirmed; social plan moves to final asset production with approved spend envelope.
Risks
Demo only — no real budget is allocated. In a real deployment: over-allocation or mis-categorisation of spend could affect campaign ROI and reporting accuracy.
Estimated cost
Sample budget: EGP 12,000 (fixture — not a real commitment).

Decision controls

These controls are permanently disabled in the demo. No decision can be recorded from this interface.

Demo mode — decisions are not recorded.
Demo mode — decisions are not recorded.
Demo mode — decisions are not recorded.

Decision flow rehearsal

Preview what a real decision sequence would look like. No decision will be recorded.

Downstream notification preview

What a downstream channel notification would look like when the decision surface is wired to a real integration. This is a static preview only.

Sample notification preview — not sent.Telegram · #campaign-approvals (fixture channel)
Approval required: Social Campaign Q3 Budget Allocation. Marketing has submitted budget proposal v2 (EGP 12,000 sample — not a real commitment). Tier: Exact revision. Deadline: 2 hours from fixture time. Review the exact revision and diff summary at the link below before deciding.
Fixture time: 19/08/2026, 10:15 Africa/CairoSource: Social Campaign Q3 Budget Allocation