Approval package · PENDING
Campaign Final Assets — Owner Approval
Tier: owner_onlyDue: 19/08/2026, 14:15 Africa/CairoAgent: Designer
Requested action
Approve the final assets bundle and alt-text draft for publication readiness.
Business reason
The end-to-end campaign workflow has reached the final production stage. All three design concepts were reviewed and the Orbit direction was selected at the human decision point. The Designer has produced the final assets and an alt-text draft. The bundle requires an owner-only approval before a publication manifest can be generated.
Artifact / revision
- Artifact ref
- run:dz-2026-08-18-0022 / final_assets_v3 / alt_text_draft_v1
- Target system
- Campaign assets store (fixture — no live system)
Supporting evidence
- run:dz-2026-08-18-0021 — three concept compositions reviewed at design direction step
- wfstep:human-select-direction — Orbit direction selected as the approved concept
- run:dz-2026-08-18-0022 — final assets and alt-text draft produced against Orbit brief
Expected result and risks
- Expected result
- publication_manifest generated; campaign bundle moves to publication queue awaiting release.
- Risks
- Demo only — no live assets exist. In a real deployment: assets published without final review could expose off-brand or inaccessible content to the audience.
- Estimated cost
- Zero — no real actions performed in this demo.
Decision controls
These controls are permanently disabled in the demo. No decision can be recorded from this interface.
Demo mode — decisions are not recorded.
Demo mode — decisions are not recorded.
Demo mode — decisions are not recorded.
Decision flow rehearsal
Preview what a real decision sequence would look like. No decision will be recorded.
Downstream notification preview
What a downstream channel notification would look like when the decision surface is wired to a real integration. This is a static preview only.
Sample notification preview — not sent.Telegram · #campaign-approvals (fixture channel)
Approval required: Campaign Final Assets — Owner Approval.
Designer has submitted the final assets bundle (run:dz-2026-08-18-0022).
Tier: Owner only. Deadline: 4 hours from fixture time.
Review the exact revision at the link below before deciding.
Fixture time: 19/08/2026, 10:15 Africa/CairoSource: Campaign Final Assets — Owner Approval