Skip to main content
DEMO ENVIRONMENTSample data — no live external actions
Business Agent OSi-STEMer Demo
Approval package · PENDING

Campaign Final Assets — Owner Approval

Tier: owner_onlyDue: 19/08/2026, 14:15 Africa/CairoAgent: Designer

Requested action

Approve the final assets bundle and alt-text draft for publication readiness.

Business reason

The end-to-end campaign workflow has reached the final production stage. All three design concepts were reviewed and the Orbit direction was selected at the human decision point. The Designer has produced the final assets and an alt-text draft. The bundle requires an owner-only approval before a publication manifest can be generated.

Artifact / revision

Artifact ref
run:dz-2026-08-18-0022 / final_assets_v3 / alt_text_draft_v1
Target system
Campaign assets store (fixture — no live system)

Supporting evidence

  • run:dz-2026-08-18-0021 — three concept compositions reviewed at design direction step
  • wfstep:human-select-direction — Orbit direction selected as the approved concept
  • run:dz-2026-08-18-0022 — final assets and alt-text draft produced against Orbit brief

Expected result and risks

Expected result
publication_manifest generated; campaign bundle moves to publication queue awaiting release.
Risks
Demo only — no live assets exist. In a real deployment: assets published without final review could expose off-brand or inaccessible content to the audience.
Estimated cost
Zero — no real actions performed in this demo.

Decision controls

These controls are permanently disabled in the demo. No decision can be recorded from this interface.

Demo mode — decisions are not recorded.
Demo mode — decisions are not recorded.
Demo mode — decisions are not recorded.

Decision flow rehearsal

Preview what a real decision sequence would look like. No decision will be recorded.

Downstream notification preview

What a downstream channel notification would look like when the decision surface is wired to a real integration. This is a static preview only.

Sample notification preview — not sent.Telegram · #campaign-approvals (fixture channel)
Approval required: Campaign Final Assets — Owner Approval. Designer has submitted the final assets bundle (run:dz-2026-08-18-0022). Tier: Owner only. Deadline: 4 hours from fixture time. Review the exact revision at the link below before deciding.
Fixture time: 19/08/2026, 10:15 Africa/CairoSource: Campaign Final Assets — Owner Approval